Tématem zadání je návrh novostavby Centra volného času v Brně s prostory pro pohybové a volnočasové aktivity. Prostory jsou navrženy jako víceúčelové s možností různého využití. Návrh bude sledovat volné začlenění stavby do prostředí vymezeného řešeného území v kontextu s navazujícím parkem a s okolní strukturou města. Centrum volného času bude využíváno obyvateli z okolí, studenty a matkami s dětmi. Stavba bude navržena tak, aby umožňovala bezbariérový pohyb osob se sníženou schopností pohybu a orientace.
EN: The topic of the assignment is the design of the new leisure center in Brno with spaces for movement and leisure activities. Spaces are designed as multipurpose with different use possibilities. The proposal will monitor the free integration of the construction into the environment of the defined area in the context of the adjacent park and the surrounding structure of the city. The leisure center will be used by residents, students and mothers with children. The construction will be designed to allow disabled people to move with reduced mobility and orientation.
URBANISTICKÉ ŘEŠENÍ
Řešené území se nachází v Brně a je vymezeno prostorem jihovýchodně od parku Kraví hora. V okolí se nachází různá sportovně-rekreační zařízení. Na jihozápadě se nachází veřejné koupaliště s plaveckým bazénem. Na severozápadní straně je areál tělovýchovné jednoty Tábor Brno, kde sídlí Oddíl národní házené Draken Brno. Na severovýchodě jsou tenisové kurty tělovýchovné jednoty Kraví hora a na východě je areál baseballového klubu Technika Brno a areál zahrádkářské kolonie.
Obdélníková parcela je nezastavěné území a je zatravněná. Nyní se zde nachází psí cvičiště, které bude kvůli výstavbě centra přesunuto do prostoru východně od veřejného koupaliště. Parcela je z jihozápadní strany ohraničená alejí stromů, které budou ponechány. Na severozápadním okraji parcely se nachází náletová zeleň, která bude odstraněna.
Parcela je přístupná od Náměstí Míru a od ulice Údolní silniční komunikací. Dále je přístupná od Fakulty stavební a od ulice Úvoz pěšími stezkami. Vstupy do objektu jsou orientovány na jihozápad a severovýchod. Stavba bude využívat kapacitu stávajícího parkoviště na severovýchodě.
ARCHITEKTONICKÉ ŘEŠENÍ
Hlavním konceptem hmotového řešením je položení dvou hmot půdorysného tvaru písmene L na sebe. Tyto hmoty jsou shodné, ale jsou vůči sobě ozrcadleny, a vytvaří tak kompozici uzavřeného a otevřeného prostoru. Uzavřené prostory se soustředí na dění uvnitř objektu. Otevřené prostory propojují interiér s exteriérem a umožňují provádění aktivit i venku. Krytý prostor poskytuje místo pro konání výstav, happeningů nebo food festivalu. Naopak střešní terasa slouží k relaxaci a oddechu. Otevřený předprostor na ose zrcadlení zvýrazňuje vstup do objektu a umožňuje shromažďování návštěvníků centra.
DISPOZIČNÍ ŘEŠENÍ
Objekt má navržen dva hlavní vstupy pro návštěvníky, které se nachází v prostřední části. Dále je zde navržen samostatný provozní vstup určený pro personál kavárny a pro zásobování. Před vstupy je navržena zpevněná plocha z betonové dlažby. Objekt je obsluhován stávajícím parkovištěm, které se nachází na severní straně. Je členěno na 61 parkovacích stání včetně dvou parkovacích stání vyhrazených osobám s omezenou schopností pohybu a orientace, která jsou umístěna bezprostředně vstupu do objektu. Hlavní vstupy vedou přes zádveří, která vytváří filtr rozdělující interiér od exteriéru. Za zádveřími se vchází do prostorné vstupní haly, ze která je středobodem celého centra a slouží jako shromažďovací prostor. Pro potřeby návštěvníků je v hale umístěna recepce.
V prvním nadzemním podlaží se nachází dva samostatné provozní celky, a to část tělovýchovná a relaxační a prostor kavárny se svým zázemím. Část pro tělovýchovu se nachází v západním křídle. Zahrnuje především víceúčelový sál určený pro pohybové aktivity jako je jóga, pilates, zumba aj. Pro tyto potřeby je sál vybaven dvěma sklady na cvičební pomůcky. Dále je k sálu připojena dělená šatna pro muže a pro ženy. Součástí šaten je hygienické zařízení, které zahrnuje dva sprchové kouty s umývadly a jednu záchodovou mísu pro každou šatnu. Vstup do sálu je umožněn dvěma směry, jedním přímo ze vstupní haly bez potřeby převlékání nebo přes šatny, čím se rozdělí čistý a nečistý provoz návštěvníků. Pro lektory je umístěna šatna s hygienickým zařízením přístupná z chodby. Z této chodby je dále dostupná úklidová komora, místnost technického zařízení budovy a kancelář určená pro vedení volnočasového centre.
Druhým provozním celkem je kavárna, která se dělí na část veřejnou a provozní. Do odbytového prostoru návštěvníci vstupují ze vstupní haly. Provozní část je obsluhována samostatným provozním vstupem a zahrnuje šarnu s WC pro zaměstnance kavárny, sklad obalů, sklad potravin, přípravnu a bar. Pro návštěvníky jsou navrženy dělené toalety pro muže a pro ženy, z toho každá obsahuje jednu kabinu WC vyhrazenou pro osoby s omezenou schopností pohybu a orientace.
Do druhého nadzemního podlaží mohou návštěvnící jít ze vstupní po dvourameném lomeném schodišti nebo využít osobní výtah. Zde se nachází shromažďovací prostor, ze kterého je přístupný výtvarný ateliér, přednáškový sál, klubovna a sklad mobiliáře. K výtvarnému ateliéru je přidružena sborovna lektorů a sklad výtvarných materiálů. Klubovna umístěná ve východním křídle je vybavena skladem. Opakuje se blok hygienického zařízení pro muže a ženy včetně kabin WC pro imobilní. Ze shromažďovacího prostoru se lze dostat na venkovní terasu.
EN:
URBANISTIC SOLUTION
The solved territory is situated in Brno and is defined by the area southeast of the Kraví hora park. There are various sports and recreational facilities nearby. In the southwest is a public swimming pool with a swimming pool. On the northwest side is the Tábor Brno physical training area, where the Draken Brno National Handball Division is housed. In the northeast, there are tennis courts for the physical education of the Kraví hora, and to the east is the baseball club Technika Brno and the area of the garden colonnade.
The rectangular plot is unconstructed and is grassed. Now there is a dog training site that will be moved to the area east of the public swimming pool due to the construction of the center. The plot is bordered by a tree-lined avenue from the southwest side, which will be left behind. On the northwest edge of the parcel there is a planetary greenery that will be removed.
The plot is accessible from Namesti Miru and from the street road road. It is also accessible from the Faculty of Civil Engineering and from the Úvoz Street by footpaths. Entrances to the building are oriented to the southwest and northeast. The building will use the capacity of the existing parking lot in the northeast.
ARCHITECTURAL SOLUTION
The main concept of a mass solution is to lay two masses of ground-shaped L-shaped on each other. These masses are the same, but they are mirrored to each other, creating a composition of closed and open space. Closed areas focus on the inside of the building. Open spaces connect the interior with the exterior and allow you to perform activities outside. The indoor area provides a venue for exhibitions, happenings or a food festival. On the contrary, the roof terrace serves for relaxation and relaxation. An open space on the mirror axis enhances the entrance to the object and allows visitors to collect the center.
DISPOSAL SOLUTIONS
The building has two main entrances for visitors located in the middle. There is also a separate operating entrance designed for café and catering staff. A reinforced concrete pavement area is proposed before the entrances. The building is serviced by the existing parking lot located on the north side. It is divided into 61 parking spaces, including two parking spaces reserved for people with limited mobility and orientation, which are located immediately on the entrance to the building. The main entrances lead through the vestibule, which creates a filter dividing the interior from the exterior. Behind the vestibule, it enters the spacious entrance hall, which is the central point of the center and serves as a gathering space. Visitors have a reception desk in the lobby.
On the first floor there are two separate operating units, namely a gymnasium and relaxation area and a café with its facilities. Part of physical training is in the western wing. It includes a multipurpose hall designed for movement activities such as yoga, pilates, zumba, etc. For these needs the hall is equipped with two storage facilities for exercise aids. There is also a split cloakroom for men and women. Part of the dressing room is a sanitary facility that includes two shower enclosures with washbasins and one toilet bowl for each changing room. Entrance to the hall is possible in two directions, one directly from the entrance hall without the need of changing clothes or through the cloakroom, which will distribute the clean and unclean traffic of the visitors. A cloakroom with sanitary facilities accessible from the corridor is located for the lecturers. From this hall is also available a cleaning chamber, a room of the technical equipment of the building and an office for the management of a leisure time center.
The second operating complex is a café, which is divided into a public and operating section. The visitors enter the sales area from the entrance hall. The operating section is serviced by a separate operational entrance and includes a wardrobe with a toilet for the cafeteria staff, a storage room, a food store, a preparation bar and a bar. For visitors, separate toilets for men and women are proposed, each of which contains one WC cabin reserved for people with reduced mobility and orientation.
On the second floor above, visitors can go from the entrance to a twin-lined staircase or take a personal lift. Here is a gathering area, from which is accessible art studio, lecture hall, clubhouse and furniture store. The art studio is associated with a collection of lecturers and a collection of art materials. The lounger located in the eastern wing is equipped with stock. The block of sanitary facilities for men and women, including toilet cabins, is repeated. From the gathering area you can reach the outdoor terrace.
KONSTRUKČNÍ A MATERIÁLOVÉ ŘEŠENÍ
Hlavní nosná konstrukce stavby je železobetonový prefabrikovaný skelet. Ten sestává ze sloupů čtvercového průřezu o rozměrech 300 x 300 mm a průvlaků obdélníkového průřezu o rozměrech 600 x 300 mm.
Na průvlacích jsou položeny prefabrikované stropní desky SPIROLL z předpjatého železobetonu o tloušťce 200 mm. Sloupy skeletu jsou uloženy na základových patkách z monolitického železobetonu o rozměrech 1000 x 1000 x 1500 mm, jež jsou betonovány do bednění v nezámrzné hloubce 1200 mm od úrovně upraveného terénu.
Ztužení skeletu tvoří stěny z keramického zdiva typu Therm tloušťky 300 mm, které jsou uloženy na základových pásech z monolitického prostého betonu. Stěny tvoříci obvodový plášť budovy jsou obloženy tepelnou izolací z minerální vlny o tloušťce 150 mm a omítnuté fasádní silikonovou omítkou.
Vnitřní nenosné zdivo je tvořeno keramickými tvarovkami tloušťky 150 mm omítnuté štukovou omítkou.
Konstrukce střechy je řešena jako jednoplášťová plochá střecha s klasickým pořadím vrstev. Střecha má spád 3 % a dešťová voda je odváděna střešními vpusťmi dále svislými instalačními šachtami do dešťové kanalizace.
Okenní a dveřní výplně otvorů jsou navrženy z dřevo-hliníkového rámu a prosklení z tepelně izolačního trojskla. Stínění v druhém nadzemním podlaží je řešeno pomocí vertikálních lamel z lepeného dřeva, které jsou k fasádě kotveny ocelovými konzolovými kotvami.
ZÁKLADNÍ VÝMĚRY
Plocha pozemku včetně parkoviště: 9025 m2
Zastavěná plocha: 1100 m2
Užitková plocha: 1880 m2
Obestavěný prostor: 6880 m3
EN:
CONSTRUCTION AND MATERIAL SOLUTION
The main supporting structure of the structure is a reinforced concrete prefabricated skeleton. It consists of 300 x 300 mm square square pillars and 600 x 300 mm rectangular cross-sections.
Precast concrete slabs SPIROLL of pre-stressed reinforced concrete with a thickness of 200 mm are laid on the slots. The skeleton pillars are mounted on foundation legs made of monolithic reinforced concrete with dimensions 1000 x 1000 x 1500 mm, which are concreted into formwork at a frost-free depth of 1200 mm from the level of the treated terrain.
The bracing of the skeleton consists of walls of ceramic masonry type Therm with a thickness of 300 mm, which are deposited on monolithic plain concrete base strips. The walls forming the perimeter of the building are lined with mineral wool thermal insulation 150 mm thick and plastered with a façade silicone plaster.
Internal non-load-bearing masonry consists of 150 mm ceramic fittings, plastered with stucco plaster.
The roof design is designed as a single-layer flat roof with a classical layer order. The roof has a fall of 3% and rainwater is taken off by roof gullies through the vertical installation shafts into the rainwater sewer.
Window and door fillings are designed from a wood-aluminum frame and a glazing made of thermal insulating triple glazing. The shading in the second floor is solved using vertical glued wood panels, which are fastened to the facade by steel brackets.
BASIC EXCHANGES
Land area including parking: 9025 m2
Built-up area: 1100 m2
Useful area: 1880 m2
Built-up area: 6880 m3
Vedoucí ateliérového projektu: doc. Ing. arch. Antonín Odvárka, Ph.D.
EN: Head of the studio project: doc. Ing. arch. Antonín Odvárka, Ph.D.