Architecture

RENEWAL OF URBAN SPA MALÉ SVATOŇOVICE

Alina Antonova
FAST VUT - Faculty of Civil Engineering, Brno University of Technology, Department of Architecture
Czech Republic

Project idea

THE GOAL OF THE STUDIO PROJECT WAS TO DESIGN SPACES THAT COULD BE FULLY USED BY THE MUNICIPALITY. CURRENTLY IN THE PREMISES OF THE HISTORICAL OBJECT, THERE ARE THE MUSEUM, CEREMONIAL HALL, SOCIAL FLATS AND A DOCTOR'S OFFICE. THE PROPOSAL IS TO MAKE WELLMESS AND ACCOMMODATION FOR GUESTS IN THE PREMISES OF THE HISTORICAL BUILDING AND CHANGE THE OPERATION OF THE MUSEUM.
THERE ARE 5 ENTRIES ON THE FIRST FLOOR. WELLNESS IS DESIGNED IN THE WHERE THE SPA IS. THE ENTRANCE TO THE STAIR AREA WHICH LEADS TO THE MEDICAL OFFICES IS FROM THE SOUTHERN PART OF THE BUILDING. 2 NP WILL BE DEFINED FOR DOCTORS. THE OPERATION WAS SIMPLIFIED AND I CREATED TWO OFFICES WITH AN ADDITIONAL WAITING ROOM. ON THE 3RD FLOOR, THE PLACE OF SOCIAL APARTMENTS WILL BE ACCOMMODATION FOR GUESTS. ABOVE THE ROOM IS A MULTIFUNCTIONAL RECREATIONAL SPACE. THERE IS A PROJECTOR AND SEATS. OPERATION MAY VARY DEPENDING ON THE NEEDS. THERE IS THERE AND A WRONG STORAGE OF EQUIPMENT FOR YOGA OR OTHER SPORTS. THE SECOND PART OF THE BUILDING ON THE FIRST FLOOR WILL BE LOCATED A CEREMONIAL HALL AND RECEPTION FOR THE MUSEUM, WHICH CONTINUES TO THE 2ND FLOOR AND 3RD FLOOR.

Project description

THERE ARE 5 ENTRIES ON THE FIRST FLOOR. WELLNESS IS DESIGNED IN THE WHERE THE SPA IS. THE ENTRANCE TO THE STAIR AREA WHICH LEADS TO THE MEDICAL OFFICES IS FROM THE SOUTHERN PART OF THE BUILDING. 2 NP WILL BE DEFINED FOR DOCTORS. THE OPERATION WAS SIMPLIFIED AND I CREATED TWO OFFICES WITH AN ADDITIONAL WAITING ROOM. ON THE 3RD FLOOR, THE PLACE OF SOCIAL FLATS WILL BE ACCOMMODATION FOR GUESTS. ABOVE THE ROOM IS A MULTIFUNCTIONAL RECREATIONAL SPACE. THERE IS A PROJECTOR AND SEATS. OPERATION MAY VARY DEPENDING ON THE NEEDS. THERE IS THERE AND A WRONG STORAGE OF EQUIPMENT FOR YOGA OR OTHER SPORTS. THE SECOND PART OF THE BUILDING ON THE FIRST FLOOR WILL BE LOCATED A CEREMONIAL HALL AND RECEPTION FOR THE MUSEUM, WHICH CONTINUES TO THE 2ND FLOOR AND 3RD FLOOR.
MATERIAL SOLUTION.
VAPENOCEMENT PLASTER WHITE COLOR. SHEET METAL ROOFING. RECONSTRUCTION OF A WOODEN CEILING IN THE ATTIC, PERFORMANCE OF WATERPROOFING WORK. INTERIOR ON THE 3RD FLOOR AND ATTIC WOODEN FLOOR.

Technical information

THE LARGEST STRUCTURAL CHANGES WERE MADE ON THE 3RD FLOOR, WHERE THE ROOMS ARE FOR GUEST ACCOMMODATION. A NEW OUTDOOR ELEVATOR HAS BEEN DESIGNED FOR BARRIER-FREE ENTRY.
THE MAIN CONCEPT IS TO AT LEAST INTERACTION INTO THE EXISTING SUPPORT STRUCTURES AND TO PRESERVE MOST MONUMENTAL VALUES
THE EXTENSION WILL BE REMOVED FROM THE EASTERN SIDE OF THE BUILDING. THE LARGEST STRUCTURAL CHANGES WERE MADE ON THE 3RD FLOOR, WHERE THE ROOMS ARE FOR ACCOMMODATION. THE NEXT INTERVENTION WILL BE THE CREATION OF A RECREATIONAL SPACE IN THE 2ND FLOOR, THE SOUTHERN PART WILL BE CHANGED AND TWO OTHER OFFICES WITH A WAITING ROOM WILL BE CREATED. THE ENTRY TO THE MUSEUM WILL BE MOVED AND A RECEPTION AND ESTABLISHMENT FOR THE EMPLOYEE WILL BE CREATED. . BEHIND THE BUILDING WILL BE A NEWLY CREATED PARKING LOT.
NEWLY DESIGNED STRUCTURES ARE BRICK MASONRY. NO INTERFERENCE WITH THE CARRIER SYSTEM HAS BEEN MADE. NEW STRUCTURES ARE PARTITIONS BETWEEN OFFICES ON THE 2ND FLOOR AND PARTITIONS WITH ACOUSTIC INSULATION DISTRIBUTING ROOMS FOR GUESTS.

Copyright © 2024 INSPIRELI | All rights reserved. Use of this website signifies your agreement to the Terms of Use, Privacy Policy, and use of cookies.