The idea of this project was to build a Bus Terminal with devided parts which each one has its own independency and role as one but in order to perform its role in a triple system which depends on the results of this three parts.
The first zone ,itself, consists of two parts.The first one is a management area and the second one is service area.
The second zone also consists of two parts, residential and repair shops.
The third zone includes a food court.
And all of them are working together to serve the passengers and the whole terminal as a system.
The structure is also a cover for the triple zone and contains all of them and act as one.